Consulting – building underground

We planned a room in a basement that was fully underground. We had a plan from the architect and wanted to incorporate the room into an existing building.

My task was to advise a contractor on how to execute his client’s commission. The main part of my work was determining the underlying conditions, calculation of construction physics and choosing appropriate materials and techniques. Extensive cooperative discussions and proposals led us to a feasible solution that conformed to the client’s wishes.
With my suggestions for long-term monitoring of the humidity of the room and material I could contribute to ensuring that the object remains without any damages for a long time.